Proscenium At Rockwell - Construction Updates, as of January 2018





 
Ongoing stone wall installation on 
the upper floors.
 
Ongoing leak test for waterproofing on the upper floors

 

Ongoing scratch coating on the 
upper floors

Ongoing hallway finishing on the 
mid level floors

 
 
Ongoing formwork and rebar works on the mid level floors
 
Properties ATC (Phils.) © 2011 Theme Designed by Fancy Girl Designs